Griffiths Civil Build Projects

Retaining Walls - Commercial Projects

Paekakariki Hill Road  Gully

Porirua City Council engaged us to repair a slip on Paekakariki Hill where the road had given way on a section above a stream. A combination of driven railway irons along with drilled and grouted anchors were used to carry out this repair. It was successfully completed with minimal disturbance to road traffic during construction.

73 Fairlie Terrace

A job that was requested by Victoria University. The current block retaining wall had begun to collapse and lean towards the property below the road. One major consideration of the project were the 33 kv electrical cables that ran below the road parallel to the old wall and supplied one third of Wellingtons electricity. Wellington Electricity was met with and a construction methodology which included the protection and retention of the cables was completed. Following this methodology the project was successfully completed, on time and on budget.

Hataitai North Vodafone RBI Upgrade

This was a job for Vodafone. We had to temporarily disconnect the cabinet and have it removed by crane, breaking out the existing timber retaining wall and concrete pad, all the while protecting the cables and ducts. We when built a new larger institute concrete pad and retaining wall, and had the site back on line in five days.

Enquiry

Question
Generate New Image

Projects

This section shows examples of some of the most recent and key projects that Griffiths Civil Build have been involved in. It showcases the variety of work that we are capable of and gives details of the individual projects, along with a scope and other relevant details and images.

Repiling, Decking & House Repairs - Grafton Rd

This project involved carrying out repairs to an existing dwelling in Roseneath that had restricted access. Our role was to undertake repair work as identified during a pre-purchase building inspection and engineers report.

Concrete Retaining Wall & Access Road - Homebush Road

This project on Homebush Road in Wellington involved the construction of a substantial precast concrete retaining wall and other works to create an access road for a new multi-lot residential development.

Timber Retaining Wall - Home in Roseneath

This home had an old concrete retaining wall that had failed and was falling over in places. After repairing a broken pipe (causing the soil to become saturated and contributing to the old wall failing) we constructed a new timber retaining wall.

Decks & Verandahs - Aotea College, Porirua

To keep the new music block build on track, Naylor Love Construction approached us to assist with the build. This project included securing foundations for relocated buildings, constructing large deck, access ramps and framing.

Earthquake Strengthening - Royal NZ Police College

A major project and the first of its kind in New Zealand. It was particularly challenging and had to be completed outside of usual office hours so the College could remain open. Limited space, harder than expected rock and ground water had to be overcome to successfully complete the job.

2 Degrees National Rollout - NZ Wide

Details of the national rollout for 2 Degrees. Tier 1 covered work in all the major centres, Tier 2 involved more remote locations that required helicopter and 4X4 access, while Tier 3 saw the completion of over 100 cell tower sites all over the country.

Telecom NZ Site Builds - North Island

Cell phone tower construction throughout the North Island. The ‘roadside' project in Palmerston North required an onsite traffic management policy, the construction at Avalon needed specialist environmental precautions and Otaki was the first to utilise Telecom's own specific design.

West Wind Farm

Limited access, steep terrain, wet slippery conditions and very high winds were complicating factors. Also the rock was very fractured due to the proximity of the main fault line.

Transpower Tower Foundation Strengthening

This project involved upgrading the foundations on transmission line towers in the upper South Island. We are proud to be associated with the 2007 New Zealand Engineering Excellence Awards Supreme Award winner.

Soil Nail Wall - Dowse to Petone

Construction of a retaining wall that included drilling and testing a sacrificial nail for design purposes, drilling and installing production nails, fabrication of nail heads, fixing mesh to the face and applying sprayed concrete.